Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 14:35:13 UTC
C.32.MWA:12 - Relations
Builds on:A.3.1 for Method identity, B.1.5 for Method order/composition and Work enactment distinctions, A.15.1 and F.6 for actual performed Work and attribution when claimed, A.22 for selected-structure identity, B.2 for whole reidentification, C.30 and C.30.AD for architecture and architecture-description distinctions, and C.36 for cultural-change relations.
Coordinates with: base C.32 for general architecture candidate synthesis; C.17 and C.18 only when NQD generation, novelty/diversity, archive, or front claims are current; C.30.STRAT before accepting level, layer, tier, stack, or similar source wording; and C.30.ILC plus C.32.MLAO when a conflict, residual, or moved burden needs its own treatment.
Provides a result to:E.4.PFAD when several practice structures change a framework-architecture answer; E.4.DPF when those structures change DPF identity, scope, pattern organization, first use, or use of named results; E.4.DPF.DA when package adequacy needs the resulting two-way sequence-versus-simultaneity evidence; and E.23.CDI only when target-practice architecture must be recovered or compared before capability development.
Does not replace: the direct domain sources and Methods, E.4 product-family decisions, explicit comparison or selection, project architecture decision, E.24.PUB publication occurrence and availability, evidence or assurance, or the currentness and refresh patterns.