Link to current text
C.40.CU:12 - Relations
- C.40 supplies material variation and retention; C.40.CD develops a changed problem and obtaining way together.
- C.39.RO constructs a reusable operation from an available case or composition.
- C.28.CM and B.5.2 develop consequential causal accounts; C.16.MR/IR/RM develop and improve interpretation of responses.
- B.1.5, B.1.5.EW and B.1.5.RS qualify composition, recover encompassing work and compare constituent replacement.
- C.32 and C.32.P2S develop architecture and its realization; C.32.MWA applies when practice structures require a joined synthesis.
- C.38 forms complete-enough comparable ways; C.11 selects among them.
- A.2.2 governs a capability claim; E.23.CAE/CDI separate supported performance conditions from needed capability development.
- A.15.8 governs configuration and recovery reliance; C.36.RP makes shared methods obtainable and renewable.