Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 07:00:10 UTC
F.11:2 - Problem frame
Design-time and run-time blur. A BPMN process description is cited as though it happened.
Description mistaken for result. Approval of an SOP is treated as proof that later Work met a target.
Work mistaken for output. A log of setpoints is treated as the whole Work occurrence.
Word drift.Activity, task, execution, process, and command change meaning across sources.
Agency blur. A Method or description is said to act, or a vague “System-in-Role” replaces the actual System, local system-role kind, assignment, Work, and performed-Work attribution.