Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 07:00:10 UTC

F.11:2 - Problem frame

  1. Design-time and run-time blur. A BPMN process description is cited as though it happened.
  2. Description mistaken for result. Approval of an SOP is treated as proof that later Work met a target.
  3. Work mistaken for output. A log of setpoints is treated as the whole Work occurrence.
  4. Word drift. Activity, task, execution, process, and command change meaning across sources.
  5. Agency blur. A Method or description is said to act, or a vague “System-in-Role” replaces the actual System, local system-role kind, assignment, Work, and performed-Work attribution.