Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-10-14 19:58:00 UTC · snapshot created 2026-10-14 19:58:38 UTC · last check 2026-10-15 02:50:18 UTC

Library.Reference:9.1.8 - What should be kept, revised or stopped?

Compare the result with the intended benefit and conditions of use. Delivered assistance, acquired mastery, changed organisational capability, useful participation and cultural continuation need their own grounds. CB.10 examines the value of participation and cultural work; FPF C.32.MWA.PP:4.10 follows a changed condition through the affected provision arrangement. Course attendance or a lower complaint count cannot alone settle these different claims.

Retain supported uses when another use fails. A lost permission may block one shared case without invalidating the Method. A provider’s departure may defeat timely help while the material remains adequate. Repair the affected contribution, change the promise or obtain another provider. IS.5 handles continuation or withdrawal of implementation support; CB.11 handles the community arrangement’s continuation, transfer or end.

After a sufficient result, use the changed starting point to choose a further worthwhile, more demanding but still attainable problem through C.40.NP. Consolidation, rest or ending an exhausted branch can protect that possibility. A support engagement may end before the recipient’s development does.