MDPE.15:4.3 - Prepare only the plan the Work needs
Use A.15.2 when a U.WorkPlan is needed. Keep it small enough to expose:
- the performing Agents, any decision-bearing
A.2.1assignments, and supporting non-agent Systems; - the selected change and direct Method;
- required material, tools, venue, bodies, instruments, software, or data;
- safety, consent, access, stop, and rollback conditions;
- the relation between change Work and any trial or evaluation Work;
- the observations and evidence to retain; and
- the next decision that may use the result.
Use C.24 only when tool or call planning is current. A useful plan remains an episteme and never establishes that Work occurred.