Library / Method Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 06:25:20 UTC

ME.20:7 - Conformance Checklist

  • The current question is about a Method, its relations, or its description; a sufficient direct result is used without a profile wrapper.
  • The next needed result and its supplying pattern are explicit; established, proposed, contradicted, and unresolved claims retain their statuses.
  • Every exposed continuation has a relevant condition and current basis, or an honest missing fact.
  • During ongoing Work, A.15.7 supplies the action choice; the chooser, intended performer, and any material authority/access/capability relation remain distinguishable.
  • A substantive change reopens its affected Method Engineering result and dependent uses; unaffectedness is checked against the retained basis.
  • Formal CGUS, persistent results, and Work claims are opened only for a use that needs them and satisfy their own direct rules.
  • The answer states the first useful result or blocker and the next stop or return, without treating reader order as Work order.