Library / Method Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 04:40:20 UTC

ME.20:8 - Common Anti-Patterns and How to Avoid Them

Failure invited by the working situationRepair
Follow the next contents entry after finishing a pattern.Recover the result needed by the current Method question and its actual prerequisites.
Reopen every Method result because one source changed.Trace the changed claim to its dependent result and uses; widen only when the reach cannot be established.
Carry an unresolved whole through a successful participant review.Preserve the individual results and return whole identity/composition to ME.7.
Treat a recommended action as current, permitted, and performed.Refresh its action-changing basis and separate the choice, authority, performer, and observed result.
Build a CGUS to describe one required action.Use the direct MethodDescription and stop; potential branching and a named formal use must justify CGUS.