OCE.14:4.6 - Return the work and the observation that can reopen it
Give the receiving participants the effective result and the remaining work:
- OCE.9 receives the contribution still to be realized and its acceptance or failure conditions.
- OCE.10 and OCE.12 receive the actual participation, explanation, challenge, leadership or learning-support need.
- OCE.11 receives the permitted overlap, continuing-service protection, recovery and hand-back conditions.
- OCE.16 receives a consequential dependency only if another separately managed change actually uses the altered condition.
- OCE.13 receives the next observation that could change the disposition, including transferred burden or an anticipated effect that fails to appear.
These are conditional returns, not a required circuit through every pattern. A direct owner may already hold a sufficient result.
Retain the reason for the revision, the rejected alternatives and the losses needed for a later decision. Reopen the affected relation when its authority expires, a relied-on condition changes, a protection or service result fails, or observation defeats the intended contribution. Keep unrelated results usable.
What changes in practice is the scope of action: the organization can retain a demonstrated contribution, repair a particular relation and expose the cost and unfinished realization, rather than treating a new diagram as a completed change.