Library / Organization Change Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 10:39:28 UTC · snapshot created 2026-10-03 10:40:04 UTC · last check 2026-10-03 11:35:10 UTC

OCE.8:6 - Bias-Annotation

Recurring biasLikely driftRepair
technology-first framingThe tool or supplier becomes the decision subject.Hold the result premise and representative Work stable, then generate whole arrangements.
novelty preferenceThe obtaining arrangement is excluded because it is familiar.Include the baseline and its smallest serious repair.
fragment comparisonTraining, hiring, outsourcing, platform, and automation labels are compared as if complete.Complete each around parity or mark its non-option status.
hybrid optimismHuman–AI or human–robotic coupling is presumed synergistic.Compare the best applicable solo configuration and observe interaction burden.
provider haloContract, catalogue, or demonstration is read as provision and capability.Recover capability evidence, acceptance, custody, continuity, recovery, substitution, and exit.
participation theaterA workshop is said to provide consent, authority, or adoption.Show whose knowledge changed which decision position and keep authority separate.
generic oversight“Human in the loop” replaces exact decision, control, override, escalation, and evidence.Request the direct predicates and conditions for this Work and jurisdiction.
recommendation inflationA preferred probe becomes a ChoiceResult.State the authorized DecisionSubject, rule, and lawful disposition independently.