Link to current text
OPS.10:6 - Bias-Annotation
| Bias | Consequence | Countermeasure |
| nominal-capacity bias | Calendar presence substitutes for usable capability and access. | Recover the relevant service and resource conditions. |
| average sufficiency | Equal totals are treated as equal service. | Inspect arrival timing, variation and the actual service criterion. |
| double-counted loss | A failure is included in service time and again deducted from capacity. | State each estimate’s contents and count the effect once. |
| precise-number confidence | A sophisticated model hides poor premises. | Match model scope to the question and qualify the result kind. |
| reserve-as-waste bias | Recovery capacity is removed to increase utilization. | Compare the named disturbance and service consequence. |