OPS.11.1:5.5 - Derive preparation and provision from a changed service requirement

Six orders for configured kits arrive together. The service must make all six kits available within two hours. One qualified technician and one workstation are available in that interval. The stipulated method needs, for each kit, 20 minutes of preparation usable for any order in the stated class and 10 minutes of case-specific finishing and acceptance. Both phases occupy the technician and workstation. There is no other work or transfer delay in this constructed comparison. Performing all six kits after arrival requires 180 minutes of each resource, exceeding the available 120.

The current method permits preparation before an order is known: each prepared item remains compatible with any kit in the stated class and usable for the whole day. Both the technician and workstation have an otherwise uncommitted two-hour window before order arrival. One candidate therefore prepares six items in that earlier window and performs the six ten-minute finishes after arrival. The last kit is accepted at minute 60. Total labor remains 180 minutes; the arrangement changes when the preparation is performed and what is held between performances. If fewer orders arrive, prepared items can remain unused, so inventory and obsolescence belong in the comparison. The two-hour service can be supported for this stipulated six-order case. If the workstation is unavailable in the earlier window, this candidate has no supported preparation slot; obtain another feasible slot or compare a different arrangement.

Now the product specification changes: preparation must use the actual ordered device’s serial-number data, which becomes available only on arrival. Preparation before the order is known is no longer usable. Keeping the previous stock does not remove the 180-minute post-arrival demand. Revise the service model because its preparation relation, work boundary and timing premise changed.

A second qualified technician with an independent workstation can provide a different arrangement, if both are actually available under the required authority. Each technician completes three thirty-minute kits; the last kits are accepted at minute 90. Compare the added provision and its displaced work with a later or smaller service offer. If the second provision is unavailable, retain the 180-minute bound for the existing arrangement and return the promise to its owner. Product engineering might supply a genuinely different preparation method, but that result must be obtained before counting its expected saving.

The unit design follows the same change. Initially an order-independent prepared item can exist before any customer case; after the change its preparation belongs to an identified order. OPS.3 preserves that correspondence, OPS.10 supplies the capacity and schedule, OPS.13 forms the possible service agreement and OPS.14 compares consequential payments and unused stock where those matter. Existing acceptance authority and the one-kit result can remain unchanged. Revise the affected capacity and delivery conclusions while keeping conditions that still hold.