OPS.11:5.1 - PumpWorks: a rig plan is not a release decision
PumpWorks continues weekly evidenced controller releases while incident I73, release candidate R42, safety question S19 and provider change P8 coexist. In this constructed use, the four ready test packages carry eight rig-hours of estimated load. The current capacity comparison names actual usable rig windows rather than the number of board cards.
The question is whether a changed readiness and rig-access plan can support the release work without losing another necessary condition.
| Selected structure or relation set | Concrete coupling needed for the decision | Receiving action |
|---|---|---|
| rig-use arrangement | provider access, qualified operator and configuration jointly permit the specified test during the booked window | choose only feasible slots and return changed access to OPS.10 |
| test-evidence relations | T9’s result must concern the configuration used for R42’s release decision | preserve configuration/result correspondence; a result for another version does not close the evidence gap |
| release-supervision relations | ReleaseSupervisorTeam-S2 uses the required evidence and safety result to issue its authorized release, hold or other decision | obtain that decision separately from completing the test |
| existing service commitments | the evidenced-release horizon has parties, conditions and authority for revision | return changed feasibility to OPS.7 and the commitment holder |
Suppose lab-test permission is current and S19 concerns field release. The coordinated result can permit T9 within its actual test conditions, keep the field release held pending S19 and the release decision, and request the needed provider access. If S19 also governs the lab test, that test lacks a sufficient permission basis and remains held too; the diagram cannot decide that scope.
OPS.8 maintains the ready queue and keeps incomplete matters visible. OPS.9 distinguishes readiness loss from an unsupported rig-bottleneck claim. OPS.10 compares the usable windows with eligible load and recovery scenarios. OPS.11 returns the compatible decisions and the missing safety or provider result to the appropriate owner.
If P8 reduces available rig time, reopen the capacity and dependent admission/release-policy decisions. Do not reinterpret a completed test as approval to bypass S19 or as evidence that the weekly service commitment has been fulfilled.
This case does not require claiming that every row is an independent flow structure. The selected permission, evidence, supervision and commitment relations are sufficient for the stated coordination question.