OPS.19:7 - Conformance Checklist
- Is the operating System, useful result, receiving decision, horizon, and exposed local choice clear?
- Are the simultaneous Work wholes and only their supported part, episode, order, or overlap relations identified?
- Are actual Work, intended Work, Methods, subjects, structures, descriptions, and records kept distinct?
- Does every selected structure or relation have a decision-changing use?
- Are results and measures stated on their own subjects, scales, horizons, schemes, and evidence bases?
- Do the alternatives differ materially and expose moved delay, burden, evidence risk, cash, service exposure, quality risk, or recovery cost?
- Are protected conditions, commitments, authority, and currentness checked before an alternative is called feasible?
- Does the return clearly state reconfiguration, bounded continuation, or exact unresolved conflict?
- Are downstream Method-trial and cultural questions left to
OPS.16andOPS.20under their own entry conditions? - Can a cold practitioner state what changes now and what reopens the decision without reconstructing an enterprise model?
Recognition passes when the practitioner can produce the short cross-scale account and distinguish the material conflict. Assurance requires the obtaining relations, evidence reach, protection conditions, and authority used by the selected decision.