OPS.6:4.5 - Specify the executable continuation contract

State the selected next Work, responsible performer, permission and effective conditions, stop or fallback, expected evidence, and the return to continuing operation. Name the observable change that would invalidate the action and require refresh. An existing plan, instruction, prompt, ticket-transition record, or model recommendation can carry this contract if it states these terms and identifies the required authorization.