PSD.16:4.1 - Anchor the engagement and the result at risk
For an ongoing engagement, inspect a concrete occurrence: the objection that could not enter the model, the evidence received after a comparison closed, or the attention demand that stopped a participant’s contribution. Distinguish an observed failure from a suspected mechanism. For a proposed engagement, use its intended-use case and proposed arrangement; name the later observation that would test it. A prospective design has no performed success to cite.
Recover the receiving question, subject, scope, horizon and decision boundary. Keep only participants, concerns, models and Method conditions that can change the arrangement decision. Existing PSD.1–PSD.7 results can supply these inputs under the conditions in section 12; no complete earlier traversal is required.
Ask what a usable return must preserve. Examples include a materially different service concern, an interpretable model assumption, a qualified configuration-specific result, a workable challenge route, or the distinction between a recommendation and the recipient’s choice. A deadline is a condition to address, not evidence that these requirements have been met.
If the supposed conflict concerns another subject or receiving decision, establish that separate boundary before joining the work. If an indispensable scope or authority premise is missing, obtain its qualified source or return that precise gap.