Library / Embodied Rhythmics Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 13:15:03 UTC

RHY.9:7 - Conformance Checklist

  • The failed receiving action and the timing information it needs are recognizable.
  • Production, cueing and the other simultaneous demands have a compatible allocation or a named conflict.
  • Advance information is available in time for the required preparation.
  • The receiving relation is considered during the actual passage, including continuation and recovery.
  • A proposal, calculated compatibility and observed performance retain their different conclusions.
  • Changed conditions reopen the affected relation.