Link to current text
RHY.9:7 - Conformance Checklist
- The failed receiving action and the timing information it needs are recognizable.
- Production, cueing and the other simultaneous demands have a compatible allocation or a named conflict.
- Advance information is available in time for the required preparation.
- The receiving relation is considered during the actual passage, including continuation and recovery.
- A proposal, calculated compatibility and observed performance retain their different conclusions.
- Changed conditions reopen the affected relation.