Library / Music and Dance Practice Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 14:25:10 UTC

MDPE.7:12 - Relations

  • C.11 supplies the local ChoiceResult. A.19.CPM supplies comparison relations when needed. Neither grants authority, commits, plans, or performs Work.
  • A.15.7 is the preferred entry for bounded next-action steering inside ongoing Work when current facts change a live branch under an already-admitted Method. It does not replace the broader development choice here.
  • MDPE.12, MDPE.15, MDPE.16, and later MDPE.20 are common conditional inputs. The full result table in MDPE.7:4.2 is a selection aid, not a required unfolding or Work order.
  • MDPE.15 → MDPE.7 is evidence input only when the local changed subject, failed attempt, direct result, or bounded observations change the next decision.
  • MDPE.16 → MDPE.7 is decision input only when live branches, stepping stones, repair needs, tests, or removal reasons change the current OptionSet or comparison.
  • MDPE.7 → MDPE.15 occurs only when the ChoiceResult selects one feasible local change. The decision authority supporting that choice, the practice-developing Agent, an assignment when Work attribution needs it, applicable permission, capability, resources, and other Work-entry conditions remain separate; the chosen Work remains unperformed.
  • A.2.8 governs obligations and prohibitions; A.2.8.PER governs permission and non-prohibition. E.10.ROLE only recovers ambiguous role wording; A.2.1 governs an obtaining assignment occurrence and its declared species; F.6 governs attribution when an Agent later performs Work under that assignment. Decision authority uses its applicable direct governor or an A.6.RCD missing-governor result. A recommendation is not silently upgraded to a decision under authority.
  • A.15.2 governs a WorkPlan after choice when one is needed. C.24 governs tool or call planning. A.15.1 governs any later Work occurrence.
  • C.36 and MDPE.17–MDPE.20 govern receiving and cultural claims. The project chooses only Work within its supported authority.