Library / Organization Change Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 04:55:15 UTC

OCE.16:11 - SoTA-Echoing

SourceRetained contributionBoundary and practitioner implication
Kanitz, Huy, Backmann and Hoegl, No change is an islandInteracting changes can generate cognitive, normative, and procedural inconsistency judgments beyond a simple resource collision.Inspect joint demands and organizational prescriptions. The primary abstract supports recognition of possible inconsistency; qualify local causal and effectiveness claims with further evidence.
Skov and Lê, Resisting by not resistingActors can construct relationships and inconsistency claims between mandated changes.Test the claimed dependency and underlying condition; neither dismiss it as resistance nor accept it automatically. Use the abstract for this recognition question; a motive diagnosis requires its own qualified evidence.
Rishani, Schouten and Hoever, Navigating multiple team membershipMembership, time allocation, and variety are different, with heterogeneous relations to effectiveness.Inspect actual role demands, action windows, informational benefit, and burden. No universal team-count or utilization threshold transfers.
Zhang, Li, Zhang, Deng and Yang, Time the SurgeNon-coinciding project portfolios and shared external overlap make timing of team activity consequential.Probe whose actions coincide rather than using total allocation alone. Use the primary abstract to recognize a timing question, then obtain a schedule qualified for the actual work.
Martinsuo and Ahola, Multi-project management in inter-organizational contextsInter-organizational multi-project settings alter strategy, resource, governance, and learning questions.Challenge one-firm authority assumptions. Use the conceptual primary abstract to recognize interorganizational questions; obtain the applicable authority and Method from their owners.
Fischer, Marcus and Röglinger, A portfolio management Method for process-mining-enabled improvement projectsA contemporary portfolio Method can directly relate strategy, identification, selection, implementation, and monitoring in its bounded setting.Use such a Method when portfolio selection is the problem. Do not generalize its cases, data, or authority to every organization change.
Current ME, OCE, OPS, A.15, C.32.MWA, and C.11 resultsSupply the substantive Method-co-use, organization, operating, Work, synthesis, and decision results.Use OCE.16 for discovery, qualification, access to the direct Method, and per-change return; obtain any missing substantive result from its owner.

Reopen when a direct supplier or existing entry supplies the same recognition, qualification, and per-change return at comparable effort; representative use finds no missed interaction that changes action; a new source defeats the consequential-action probe or participant/evidence boundary; or changed ME, OCE, OPS, or domain results make the route or promised use false.