| “Automate 60 percent of the process.” | Name the result and Work, then specify performer/support roles, interfaces, authority, recovery, and evidence for complete candidates. |
| “Train the current team or outsource.” | Complete both ways around capability, access, integration, provider, continuity, and transfer conditions before comparison. |
| “AI plus a reviewer is safest.” | Request the exact safety and authority results; compare human-only, AI-only when admissible, and combined performance at parity. |
| “The vendor owns the outcome.” | Separate supplied Work/result/service, receiving acceptance, retained authority, provider capability, provision, and exit. |
| “The robot passed the demo.” | Require representative Work or a present WorkPlan, applicable safety conditions, actual performers/supports, recovery, and receiving-use evidence. |
| “Participants chose the hybrid.” | Record their decision-bearing evidence or proposal and make the choice under current authority. |
| “Start the pilot and decide later.” | First name the trial DecisionSubject, authority, reversible probe, protected conditions, evidence window, and stop/revert rule. |
| “OCE.8 selected it, so the new arrangement exists.” | Return selected constraints to direct owners and OCE.9; observe actual Work, relations, capability, and results separately. |