OPS.2:4 - Solution
Select views and coordination Methods from the operating questions they must answer. Preserve Work identity across views, select actual structures independently, and combine only those views whose distinct information changes the decision.
OPS.2:4.1 - Pattern-Use Unfolding
- Recover the operating input. Start from the OPS.1 operating System, continuing result, commitments, subjects, units, horizon, and decision. Stop if the mode question is only a label preference.
- List the viewpoint questions. Name each user, decision, subject, grain, horizon, and missing information. Separate planning, recurring execution, case continuation, aggregate waiting/capacity, and control questions.
- Generate serious view candidates. Include project or programme, process, case, queueing, and control-structure views only where their questions are current. Include the incumbent as the no-change option, and a simpler view when it is a plausible alternative.
- Compare fit to the current Work. Examine predictability, recurrence, subject identity, decision latency, runtime discretion, plannability, shared-resource coupling, exception frequency, evidence refresh, and authority. These are comparison prompts, not a universal scoring formula.
- Select the coordination Method separately. State which reusable coordination Method is used with each view, its applicability, burden, evidence, and stop. A notation, board, model, or view does not establish a Method.
- Select actual structures independently. Use
A.22when a transformation-flow, queue/resource-dependency, commitment, event, case-state, control, or other actual structure changes the decision. A mathematical graph or diagram remains a representation. - Use the control branch conditionally. When observation, decision, actuation, supervision, feedback, or rate separation changes coordination, use
A.22andC.30.LCAto identify one selected control structure and recover the needed view. UseB.2.5only for an obtaining two-sided supervisor relation andC.27.TA,C.27, orA.3.3for the exact rate, temporal, or dynamics claim. Stop without a control view when no control relation changes the decision. - Compose views explicitly. State subject correspondences, scope and grain, governing commitments, state correspondence, handoff or coexistence conditions, decision rights, update rules, conflicts, and stop conditions. Do not rely on a “hybrid” label.
- Test with a changing case. Ask what happens when new evidence defeats the plan, a case crosses a process boundary, queue delay changes a commitment, or control evidence arrives at a different rate. Repair only the affected view or correspondence.
- Return and reopen. Record selected and rejected views, coordination Methods, unresolved correspondences, next subject-account need, and one observation that reopens the decision.
OPS.2:4.2 - Record the Result
| Result position | Required content |
|---|---|
| use boundary | Users, decisions, subjects, grains, horizons, and useful stop. |
| viewpoint questions | The planning, recurrence, case-state, aggregate waiting/capacity, control, or other exact questions that remain current. |
| candidate views | Incumbent (no change), serious alternatives, selection reasons, rejected uses, and missing evidence. |
| coordination Methods | Named Methods, applicability, burden, evidence, authority, and stops; no identity with the view or tool. |
| selected structures | Exact actual structures and direct relations relied on, plus representation and mathematical-lens boundaries. |
| mixed-mode correspondences | Subjects, grains, commitments, state correspondence, handoffs/coexistence, update and decision rules, conflicts, and stops. |
| control branch | Selected FPF control view and relied-on relations/rate claims, or an explicit not current or return result. |
| continuation | Inputs supplied to OPS.3/OPS.4 and an observable reopen condition. |
OPS.2:4.3 - What Changes in Practice
The team stops asking whether Work “is” a project, process, or case. It asks which descriptions and coordination Methods answer each decision, then relates them through exact subjects and commitments. A view can be added, narrowed, or retired without retyping the Work or rebuilding every other view.