Library / Operations Management Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 04:30:10 UTC

OPS.6:7 - Conformance Checklist

  • The exact case subject, configuration, horizon, and served demand or commitment are named.
  • The required current permission is supported for the same matter and conditions; admission alone is not treated as that permission.
  • Current case state, domain Method, obligations, commitments, evidence, and exception are recovered.
  • The deciding System, responsible performer, permission, capability, assignment, and authority remain distinct.
  • Available actions, selected action, actual Work, records, evidence, and state claims remain distinct.
  • Direct mandatory or recognition branches are used when adequate.
  • C.11 is used only when several admissible live actions genuinely require comparison.
  • The continuation contract names Work, performer, conditions, stop or fallback, expected evidence, refresh, and return.
  • Case progression is reported only after independently supported Work and adequate resulting evidence.
  • A plan, ticket, model output, episode, trace, or record update is not treated as progress by itself.
  • The result is either evidenced progression or an exact unmet-condition return with owner, fallback or stop, and retry.
  • Specialist and wider Operations results remain with their owners.