SYSE.21:7 - Conformance Checklist
The following conditions are required for a conforming use of this pattern.
- The pattern use names the engineering profile, population, place, period, project system-of-interest when designated or another decision-relevant world-side subject, and receiving decision.
- Representative Work and enacted Methods ground the current variant.
- Performing Agents, participating Systems, MethodDescriptions, carriers, and result epistemes retain their own relations.
- Every asserted cultural claim names its variant, participants, population, period, evidence, and uncertainty.
- For a project choice, the deciding Agent, decision Work, assignment when needed and direct authority are recoverable.
- Options used in the current comparison differ through an engineering Method or another decision-bearing relation; sufficient continuation requires no fabricated rival.
- The comparison includes engineering consequences, consequences for named affected Systems, and every material moved burden.
- Project choice, intervention Work, later enactment, cultural selection, retention, and effect remain separate claims.
- Repertoire and human-capability returns are supplied only for a receiving need and cross its stated threshold and use boundary.
- The receiving engineer or manager can use the qualified account, continuation or stop; a later necessary reason remains with that result, without a mandatory next experiment or omission certificate.