LDR.Source:1 - What this text depends on
LDR.1, LDR.2, LDR.4 and LDR.5 identify the four leadership patterns in this publication. B.5.SD supplies the separately published intellectual-answer construction. Cite the framework title, edition and pattern when a particular account matters; a short PatternID assumes that its supplying publication is known.
The leadership repertoire distinguishes developing joint direction and participation, enabling a contribution, agreeing feasible terms, and preparing a proposal through first useful performance. The separately supplied B.5.SD constructs the connected subject answer.
The text uses FPF’s distinction between a method, its description, planned work and performed work; the receiving-result construction in C.39; the several-structure synthesis in C.32.MWA; and the cost and inquiry appraisal in C.11.DUA. C.36.RP supplies ways to keep shared methods obtainable and support their renewal. C.36 qualifies cultural-continuation claims, while C.28 qualifies causal claims. The direct returns below identify the FPF and domain contributions and the conditions used here. Source explanations and the professional results obtained in a particular use remain different grounds.
These references explain how to obtain the contributions in the table. For a local result, authorization, capability or agreement you rely on, establish its grounds under the conditions in the last column.
| Relied-on publication and content | Result needed here and receiving use | Use condition and return |
|---|---|---|
| FPF, C.39:4 | A connected way to obtain a missing result; used when B.5.SD lacks an operative subject construction or when the assignment is to design a connection among leadership contributions. | Use an adequate direct method when available. Reopen the construction if the receiving result or needed relation changes. |
| FPF C.32.MWA:4 | Distinguishes and relates methods, work, capability and arrangements; used in LDR.1’s allocation of contributions. | Do not infer one method per job or one performer per pattern. A changed performer configuration can require redesign of the whole arrangement. |
| FPF A.3.1.QM — Qualify a Method for Its Intended Contribution | Bounded qualification of a leadership Method or candidate account and its independently decidable local connections after a doubtful use. | Preserve the subject’s status and actual receiving conditions. Retain sufficient current evidence; revise only the failed contribution or select an adequate alternative. OCE.15 supplies construction of an organization-change contribution when that specific question remains. |
| FPF C.11, C.11.DUA:4 and D.4 | C.11 supplies decision reasoning; C.11.DUA:4 appraises the value and burden of additional inquiry; D.4 supplies value-conflict reasoning. Use the contribution that the alternatives, disputed demands or plural parties require. | Retain effective obligations until properly changed. A comparison is not another party’s consent. |
| Organization Change Engineering (OCE), OCE.4–OCE.7 and OCE.9–OCE.11 | Organizational contribution relations, assignments, coordinated product and organization choices, capability realization, participation inquiry and reconciliation of change with continuing service. | Required when the receiving use actually changes or depends on those organizational conditions. A leadership conversation does not supply their results. |
| OCE.18 | Connects a human career transition to actual receiving work, compatible current work, preparation, time and assignment. | Preserve the person’s aims and agreed use of learning observations. Use for that complete organizational question; a leadership-development target alone does not grant an appointment. |
| Human Capability Development (HCD), HCD.1, HCD.3, HCD.4, HCD.7 and HCD.8 | Human demand, target, capability profile, provider capability and access conditions, and development of a missing provider capability. | Needed for a human-learning claim. Do not transfer its learning mechanisms to an organization or AI without their own methods. |
| Corporate Governance (CGOV), CGOV.3 and CGOV.11 | Applicable corporate power and an effective decision with usable conditions. | Use the corporation’s actual rules and adequate existing delegation. Consultation and agreement cannot replace a required act. |
| Community Management (CB), CB.13 | Representation and a workable shared-decision mandate. | Needed where this is missing in a voluntary or member-governed arrangement; no second protocol when an adequate one exists. |
| HCD, HCD.2 and HCD.15 | Complete personal development alternatives and continuing learning from actual work; used in Reference:1.6. | Preserve the person’s participation, actual work, practice and support conditions; the comparison does not itself choose or demonstrate learning. |
| Strategy (STR), STR.5/.6/.18 | A worthwhile contribution, an obtaining way and a coherent strategic judgement when LDR.5 exposes that question. | Obtain the subject grounds and bring them back to the people whose initiative and participation are needed. A defensible strategy does not establish their agreement. |
| Community Management (CB), CB.1 | Construction of a useful community or cultural contribution when that is the proposed undertaking. | Preserve participant and sponsor purposes, actual contribution and the possibility that no community is needed. |
| Systems Engineering (SYSE), SYSE.6, SYSE.17 and SYSE.24 | Engineering architecture choice, affected systems and whole-result alternatives. | Use for engineering subject work. Other domains need their own professional method rather than an engineering label. |
| Operations Management (OPS), OPS.13 | An authorized response to an existing promise or changed commitment. | A proposed new agreement does not automatically cancel a current obligation. |
| FPF C.41.OF — Fit a Checklist to Its Occasion of Use | A checklist fitted to its actual occasion and continuation. | Use when an execution aid helps; the aid does not perform the subject reasoning or repair a missing result. |
| FPF C.36, C.36.RP and C.28 | C.36 qualifies claims about cultural relations and their continuation; C.36.RP supplies ways to keep shared methods obtainable and support their renewal; C.28 qualifies causal claims. | Use C.36.RP when later participants need a way to obtain the method. Use C.36 or C.28 when making the corresponding cultural or causal claim; a first contribution establishes neither automatically. |
These are one-way content dependencies of this framework. Their availability as descriptions is distinct from the local availability of capable providers, rights, evidence or resources. If the method needed for a current result is unavailable or incompatible with the local conditions, state that missing contribution and revise the proposed use.