Source changed 2026-10-03 08:25:59 UTC · snapshot created 2026-10-03 08:26:43 UTC · last check 2026-10-03 09:25:05 UTC
MDPE.21:7 - Relations
MDPE.8 identifies the current subject and change question; MDPE.1 frames the project scale.
MDPE.9, MDPE.10, and MDPE.3 supply candidate, capability, and performing-configuration results when those
concerns limit the selected architecture.
MDPE.11, MDPE.5, MDPE.12, MDPE.23, and MDPE.13 keep enactment, occurrence, observation, recognition
capability, and recognition-and-selection arrangements separate.
MDPE.6, MDPE.17, MDPE.18, and MDPE.19 address receiving use, transmission, usable memory, and continued
reproduction.
MDPE.22 supplies a tested support-environment change result; MDPE.14 supplies a practice-conflict decision; MDPE.16 supplies checked availability of useful alternatives; MDPE.20 supplies a trajectory decision; and MDPE.24 supplies a decision about whether evidence warrants treating a new whole as the project subject.
MDPE.21 uses applicable Systems Engineering results when the project changes an engineered System and applicable Method Engineering results when it changes a Method.